Please call Technicon Enterprises at 610-286-1622 at least 24-hours in advance to schedule inspections.

REQUIRED U.C.C. INSPECTIONS

  • Footing bearing capacity (if required)
  • Footing
  • Foundation wall (before pour)
  • Foundation wall (Midpoint) (if CMU w/grouted cores)
  • Foundation wall backfill
  • Rough electrical
  • Rough mechanical
  • Building Sewer
  • Rough Plumbing
  • Rough Framing
  • Insulation
  • Drywall
  • Final Plumbing
  • Final Electrical
  • Final Mechanical
  • Occupancy

ADA ACCESSIBILITY REVIEW

No commercial building permit shall be issued until the Township received approved drawings, signed and stamped:

“AS APPROVED BY TECHNICON ENTERPRISES”

 

All applicants are hereby notified that, they and/or their contractor(s) and their registered professional architect(s) and/or engineer(s) are ultimately responsible for assuring that ALL applicable Sections of the 2018 International Building, Plumbing, Mechanical, Electrical, Energy, and Fire Codes are complied with for ANY and ALL structures which are constructed.